haku: @author Berry, W. L. / yhteensä: 7
viite: 3 / 7
Tekijä:Penlesky, R. J.
Wemmerlöv, U.
Berry, W. L.
Otsikko:Filtering heuristics for rescheduling open orders in MRP systems (Materialplanung, Materialflussplanung, Planungsmodell, heuristische Methode)
Lehti:International Journal of Production Research
1991 : NOV, VOL. 29:11, p. 2279-2296
Asiasana:
Vapaa asiasana:FERTIGUNGSPLANUNG
Kieli:eng
Tiivistelmä:This paper is concerned with the problem of maintaining internal open order due dates in manufacturing firms that plan and schedule their operations using MRP systems. Earlier studies focused on two due date maintenance procedures: fixed and dynamic. When using the fixed procedure, order due dates are never changed. Under the dynamic procedure, all shop due dates are changed to reflect the most current order due dates. A simulation model of an MRP-driven job shop is used to investigate the middle ground between these two extremes.
SCIMA tietueen numero: 135611
lisää koriin
SCIMA