Tekijä:Goyal, S. K.
Otsikko:A note on 'Dealing with a self life constraint in cyclic scheduling by adjusting both cycle time and production rate' (Maschinenbelegungsplanung; Mathematisches Modell)
Lehti:International Journal of Production Research
1996 : OCT, VOL. 34:10, p. 2967-2969,2971
Asiasana:
Vapaa asiasana:OPTIMIERUNGSRECHNUNG,
FERTIGUNGSSTEUERUNG
Kieli:eng
Tiivistelmä:Silver (1995) suggested adjusting simultaneously the cycle time and the production rate of the item for which the self life constraint is violated for obtaining an economic feasible schedule for a family of items sharing a common production facility. In this note the feasibility condition for obtaining a feasible schedule is tightened as well as corrected results of various options are presented for the two examples given. Silver comments on the author's note.
SCIMA tietueen numero: 158252