search query: @keyword alihankinta / total: 35
reference: 5 / 35
« previous | next »
Author:Wahlroos, Juho
Title:Tilauksen ennakkotietojen hyödyntäminen siltanosturin nostovaunun läpimenoajan lyhentämisessä
Utilization of pre-order information for shortening the lead time of bridge crane hoisting trolley
Publication type:Master's thesis
Publication year:2014
Pages:83 + 1      Language:   fin
Department/School:Insinööritieteiden korkeakoulu
Main subject:Tuotantotekniikka   (K3002)
Supervisor:Aaltonen, Kalevi
Instructor:Laiho, Pasi
Electronic version URL: http://urn.fi/URN:NBN:fi:aalto-201405131790
OEVS:
Electronic archive copy is available via Aalto Thesis Database.
Instructions

Reading digital theses in the closed network of the Aalto University Harald Herlin Learning Centre

In the closed network of Learning Centre you can read digital and digitized theses not available in the open network.

The Learning Centre contact details and opening hours: https://learningcentre.aalto.fi/en/harald-herlin-learning-centre/

You can read theses on the Learning Centre customer computers, which are available on all floors.

Logging on to the customer computers

  • Aalto University staff members log on to the customer computer using the Aalto username and password.
  • Other customers log on using a shared username and password.

Opening a thesis

  • On the desktop of the customer computers, you will find an icon titled:

    Aalto Thesis Database

  • Click on the icon to search for and open the thesis you are looking for from Aaltodoc database. You can find the thesis file by clicking the link on the OEV or OEVS field.

Reading the thesis

  • You can either print the thesis or read it on the customer computer screen.
  • You cannot save the thesis file on a flash drive or email it.
  • You cannot copy text or images from the file.
  • You cannot edit the file.

Printing the thesis

  • You can print the thesis for your personal study or research use.
  • Aalto University students and staff members may print black-and-white prints on the PrintingPoint devices when using the computer with personal Aalto username and password. Color printing is possible using the printer u90203-psc3, which is located near the customer service. Color printing is subject to a charge to Aalto University students and staff members.
  • Other customers can use the printer u90203-psc3. All printing is subject to a charge to non-University members.
Location:P1 Ark Aalto     | Archive
Keywords:lead time
delivery time
delivery process
pre-order information
subcontracting
läpimenoaika
toimitusaika
toimitusprosessi
ennakkotiedot
alihankinta
Abstract (eng):The goal for this thesis work is to find solutions for shortening the lead time of industrial trolley production utilizing the pre-order information available as the lead time plays an important role in tendering phase. The minimum level of information needs to be defined in order to begin the manufacturing operations of the industrial trolley at earlier time.

The methods used are the literature review and the current state analysis of the crane manufacturing company. Further development suggestions are acquired by benchmarking other companies. In the literature review this study focuses on the features of the production systems and the effects of product modularization of manufactured products. The position of the order penetration point from the production process point of view is discussed. After that the importance of purchasing and demand forecasting in delivery process is discussed. Finally the main phases and the largest risks of implementation of the new Enterprise Resource Planning are explored.

The current state analysis includes studying the main components and the construction of the product. The most critical components considering the lead time were defined and the effects of the technical features to the components were examined. After that the utilization of the pre-order information in the delivery process was reviewed.

The information required to define the critical components on the item level was determined as a result of this research. To acquire this information from the sales units a form was developed. Utilizing this information it is possible to purchase the long delivery time components at an earlier phase of the delivery process thus the components are available for the assembly line at the right time.
Abstract (fin):Tämän diplomityön tavoitteena on etsiä keinoja teollisuusnostovaunun läpimenoajan lyhentämiseksi hyödyntämällä asiakastilauksilta saatavia ennakkotietoja, sillä teollisuusnostovaunun toimitusaika on tärkeä kriteeri tarjouskilpailussa. Tarkoituksena on määritellä tilaukselta tarvittava tietotaso, jonka avulla vaunun valmistukseen tarvittavia toimenpiteitä on mahdollista aloittaa aikaisemmassa vaiheessa.

Tutkimusmenetelmänä on käytetty kirjallisuustutkimusta ja nykytila-analyysiä. Näiden lisäksi kehitysideoita on hankittu benchmark-vierailuilla. Kirjallisuustutkimuksessa käsitellään tuotantojärjestelmien ominaisuuksia ja tuotteen modulaarisuuden vaikutuksia valmistukseen. Lisäksi käydään läpi tilauspisteen paikan vaikutusta valmistusprosessiin ja tarkastellaan ostotoiminnan merkitystä toimitusprosessissa. Tämän jälkeen tutkitaan kysynnän ennustamisen käyttöä tuotannon apuna. Lopuksi tutkitaan uuden toiminnanohjausjärjestelmän ylösajovaiheen tärkeimmät kohdat ja suurimmat riskit.

Nykytila-analyysissä selvitettiin valmistettavan tuotteen rakenne ja tärkeimmät komponentit. Lisäksi tutkittiin toimitusajan kannalta kriittisimpiä komponentteja ja vaunun teknisten ominaisuuksien vaikutusta niihin. Tämän jälkeen tarkasteltiin vaunun toimitusprosessin muodostavia osaprosesseja ja ennakkotietojen käyttöä prosessissa.

Tämän työn tuloksena selvitettiin kriittisten komponenttien nimiketasoiseen määrittelemiseen vaadittavat vaunun tekniset tiedot. Näiden tietojen hankkimiseksi kehiteltiin lomake, josta selviää valmistuksen kannalta tärkeimmät tekniset ominaisuudet. Hankittujen tietojen avulla muodostettiin prosessi, jonka avulla pitkän toimitusajan komponentteja voidaan hankkia aikaisemmassa vaiheessa. Tämä mahdollistaa komponenttien oikea-aikaisen saatavuuden vaunun kokoonpanon aloitushetkellä.
ED:2014-05-18
INSSI record number: 49025
+ add basket
« previous | next »
INSSI