Author:Russell, G. R.
Fry, T. D.
Title:Order review/release and lot splitting in drum/buffer/rope (Fertigungskontrolle; Kapazitätsplanung)
Journal:International Journal of Production Research
1997 : MAR, VOL. 35:3, p. 827-845
Index terms:
Freeterms:FERTIGUNGSSTEUERUNG, FERTIGUNGSPLANUNG,
LOSGRÖSSE
Language:eng
Abstract:A recently developed alternative to traditional planning and control systems such as MRP and JIT is the drum/buffer/rope (DBR) system. The most obvious application of the DBR is when plant performance is constrained by a lack of manufacturing capacity at a key workcenter. This study investigates two issues relating to the operation of the DBR. Specifically, what order review release (ORR) methodologies are best suited for a DBR and what is the impact of splitting process batches into several transfer batches? First, a brief introduction to the DBR system is presented for those readers unfamiliar with the system.
SCIMA record nr: 163669
add to basket
SCIMA