Author:Moncrieff, S.
Title:Dynamic first run puts Seoul Olympics in view
Journal:Broadcast
1987 : SEPT, 18 p.8
Index terms:
Freeterms:Bid, Technology, Success
Language:eng
Abstract:Dynamic Technology (DT) is commissioned by NBC to build a production centre for transmission of the Olympic Games. It will consist of control rooms, editing suites equipped with the best machines. NBC team tested the prototype and they were satisfied with the quality. The centre will be completed by May 1988.
SCIMA record nr: 77174
add to basket
SCIMA