search query: @author Arosio, M. / total: 1
reference: 1 / 1
« previous | next »
| Author: | Arosio, M. Sianesi, A. |
| Title: | A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setups. (Planungsmodell, Fertigungskontrolle) |
| Journal: | International Journal of Production Research
1993 : VOL. 31:3, p. 531-553 |
| Index terms: | |
| Freeterms: | FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM |
| Language: | eng |
| Abstract: | Correct formulation of the MPS is important for the optimization of a production planning and control system. Most of the models solve the problem in two separate sequential stages: lot sizing and then sequencing. This often produces an MPS which is not optimized. This paper presents a heuristic algorithm which solves the problem of lot sizing and sequencing in a single logic stage, together with the results of a series of tests carried out to compare the performance of the proposed heuristic and those of another algorithm taken from literature. |
« previous | next »
SCIMA