search query: @author Bai, S. X. / total: 1
reference: 1 / 1
« previous | next »
Author:Bai, S. X.
Gershwin, S. B.
Title:Scheduling manufacturing systems with work-in-process inventory control: multiple part type systems (Mathematisches Modell; Maschinenbelegungsplanung)
Journal:International Journal of Production Research
1994 : FEB, VOL. 32:2, p. 365-385
Index terms:
Freeterms:FERTIGUNGSSTEUERUNG
Language:eng
Abstract:This article studies the real time production scheduling problem for multiple part type flowshops. The system under consideration consists of many machines and produces many product types. Each part goes through the system following a predefined routeing and may visit each machine at most once. The authors consider 3 classes of activities: operations, failures or repairs, and starvation or blockage. The scheduling objectives are to keep the actual production close to the demand and to reduce the work-in-process inventory and cycle time.
SCIMA record nr: 136557
add to basket
« previous | next »
SCIMA