search query: @author Everett, J.E. / total: 1
reference: 1 / 1
« previous | next »
Author:Everett, J.E.
Title:Iron ore production scheduling to improve product quality
Journal:European Journal of Operational Research
2001 : MAR, VOL. 129:2, p. 355-361
Index terms:Metals industry
Decision support systems
Logistics
Scheduling
Simulation
Quality control
Models
Language:eng
Abstract:Iron ore quality depends upon successive shipments being uniform in composition, not only in iron but also in several other minerals. The production process involves several stages of scheduling, from the mine face, through railing, stockpiling and ship loading. At each of these stages there is potential to improve the composition uniformity through appropriate scheduling procedures. This paper discusses a variety of algorithms and simulation models developed to aid these scheduling decisions.
SCIMA record nr: 219443
add to basket
« previous | next »
SCIMA