search query: @author Klein, R. / total: 11
reference: 7 / 11
« previous | next »
Author:Klein, R.
Scholl, A.
Title:Computing lower bounds by destructive improvement - an application to resource-constrained project scheduling
Journal:European Journal of Operational Research
1999 : JAN 16, VOL. 112:2, p. 322-346
Index terms:OPERATIONAL RESEARCH
PROJECTS
SCHEDULING
Language:eng
Abstract:In this paper, two meta-strategies for computing lower bounds are described. Constructive(direct) methods directly calculate a bound value by relaxing a problem and solving this relaxation. Destructive improvement techniques restrict a problem by setting a maximum objective function value F and try to contradict (destruct) the feasibility of this reduced problem. In case of success, F or even F+1 is a valid lower bound value.
SCIMA record nr: 189350
add to basket
« previous | next »
SCIMA