search query: @indexterm farms / total: 125
reference: 33 / 125
« previous | next »
Author:Vitoriano, B. (et al.)
Title:Two alternative models for farm management: discrete versus continuous time horizon
Journal:European Journal of Operational Research
2003 : FEB, VOL. 144:3, p. 613-628
Index terms:Agriculture
Farms
Logistics
Production scheduling
Resource allocation
Language:eng
Abstract:Crop production entails many decision making processes aimed at improving productivity and achieving the best yield from scarce resources. This paper presents two alternative mathematical models to attain the proposed objective. The first model splits the time into discrete units spread throughout the planning horizon. The second model keeps a continuous time horizon; a scheduling model is used for which a family of incompatibility conditions is introduced to avoid a certain type of simultaneous usage of resources.
SCIMA record nr: 249806
add to basket
« previous | next »
SCIMA