search query: @author Taylor, B. W. / total: 14
reference: 1 / 14
« previous | next »
Author: | Philipoom, P. R. Rees, L. P. Taylor, B. W. |
Title: | Solving the economic lot-scheduling problem using the method of prime subperiods. |
Journal: | Decision Sciences
1989 : FALL, VOL. 20:4, p. 794-809 |
Index terms: | PRODUCTION MANAGEMENT OPERATIONS MANAGEMENT SCHEDULING INVENTORY CONTROL |
Language: | eng |
Abstract: | The reported successes of Japanese production systems has focussed the managers' attention on efficient decision-making for determining production schedules that minimize inventory costs. The economic lot- scheduling problem (ELSP) is relevant where machining operations are prevalent. ELSP determines lot-sizes for N products with constant demand to minimize setup and inventory costs. The best methods have been based on the notion of a basic period. The present paper proposes a heuristic extension called the method of prime subperiods. Numerical examples indicate superior performance. |
« previous | next »
SCIMA