search query: @author Goyal, S. K. / total: 16
reference: 4 / 16
| Author: | Goyal, S. K. |
| Title: | A note on 'Dealing with a self life constraint in cyclic scheduling by adjusting both cycle time and production rate' (Maschinenbelegungsplanung; Mathematisches Modell) |
| Journal: | International Journal of Production Research
1996 : OCT, VOL. 34:10, p. 2967-2969,2971 |
| Index terms: | |
| Freeterms: | OPTIMIERUNGSRECHNUNG, FERTIGUNGSSTEUERUNG |
| Language: | eng |
| Abstract: | Silver (1995) suggested adjusting simultaneously the cycle time and the production rate of the item for which the self life constraint is violated for obtaining an economic feasible schedule for a family of items sharing a common production facility. In this note the feasibility condition for obtaining a feasible schedule is tightened as well as corrected results of various options are presented for the two examples given. Silver comments on the author's note. |
SCIMA