search query: @author Goyal, S. K. / total: 16
reference: 4 / 16
Author: | Goyal, S. K. |
Title: | A note on 'Dealing with a self life constraint in cyclic scheduling by adjusting both cycle time and production rate' (Maschinenbelegungsplanung; Mathematisches Modell) |
Journal: | International Journal of Production Research
1996 : OCT, VOL. 34:10, p. 2967-2969,2971 |
Index terms: | |
Freeterms: | OPTIMIERUNGSRECHNUNG, FERTIGUNGSSTEUERUNG |
Language: | eng |
Abstract: | Silver (1995) suggested adjusting simultaneously the cycle time and the production rate of the item for which the self life constraint is violated for obtaining an economic feasible schedule for a family of items sharing a common production facility. In this note the feasibility condition for obtaining a feasible schedule is tightened as well as corrected results of various options are presented for the two examples given. Silver comments on the author's note. |
SCIMA