search query: @freeterm Fertigungsorganisation / total: 164
reference: 73 / 164
Author: | Levasseur, G. A. Helms, M. M. Zink, A. A. |
Title: | A conversion from a functional to a cellular manufacturing layout at Steward Inc. (Zuliefererbetriebe, Fabriklayout, Gruppentechnologie) |
Journal: | Production and Inventory Management Journal
1995 : SEP, VOL. 36:3, p. 37-42 |
Index terms: | |
Freeterms: | KAPAZITÄTSAUSLASTUNG, FERTIGUNGSORGANISATION |
Language: | eng |
Abstract: | Steward Inc., an international manufacturer of electromagnetic interference suppressions components supplied to a division of General Motors , was forecasting a tremendous increase in the demand for ferrite filters. The rapid increase in the requirements was being hindered by the capacity limitations. Industrial engineers recommended Steward change to a cellular manufacturing layout. Both advantages and disadvantages of the process layout changes are outlined in this article. |
SCIMA