search query: @author Cheng, T. C. E. / total: 17
reference: 6 / 17
« previous | next »
Author:Cheng, T. C. E.
Title:Analysis of material flow in a job with assembly operations (Materialflussplanung; Statistische Methode; Auftragsfertigung)
Journal:International Journal of Production Research
1990 : JUL, VOL. 44E - 28:7, p. 1369-1383
Index terms:
Freeterms:FERTIGUNGSSTEUERUNG
Language:eng
Abstract:Facing the competitive pressure, today's manufacturers must strive to keep delivery promises and reduce inventory. This depends largely on the ability to predict job flowtimes reliably, hence allowing the assignment of accurate and attainable due dates. An approximation method is presented to estimate the mean and standard deviation of job flowtimes in a dynamic job shop with assembly operations. The accuracy of the method is assessed through computer simulation.
SCIMA record nr: 143904
add to basket
« previous | next »
SCIMA