search query: @indexterm JUST-IN-TIME PRODUCTION / total: 178
reference: 18 / 178
« previous | next »
Author:Miltenburg, J.
Title:Balancing U-lines in a multiple U-line facility
Journal:European Journal of Operational Research
1998 : AUG 16, VOL. 109:1, p. 1-23
Index terms:JUST-IN-TIME PRODUCTION
DYNAMIC PROGRAMMING
MANUFACTURING
Language:eng
Abstract:U-shaped production lines and facilities consisting of many such lines are important parts of modern manufacturing systems. The problems of balancing and re-balancing U-line facilities is studied in this paper. Like the traditional line balancing problem this problem is NP-hard. The objective is to assign tasks to a minimum number of regular, crossover, and multiline stations while satisfying cycle time, precedence, location, and station-type constraints.
SCIMA record nr: 179950
add to basket
« previous | next »
SCIMA