search query: @indexterm JUST-IN-TIME PRODUCTION / total: 178
reference: 170 / 178
« previous | next »
Author:Faulhaber, T. A.
Coad, F. A.
Little, T. J.
Title:Building a process cost management system from the bottom up.
Journal:Management Accounting (New York)
1988 : MAY, VOL. 69:11, p. 58-62
Index terms:COST ACCOUNTING
JUST-IN-TIME PRODUCTION
PERFORMANCE MEASUREMENT
Language:eng
Abstract:The use of a process cost management system and performance standards at the Merrill-Continental Company, Inc., and the new system at the plant level. Measuring and monitoring system without outside time and motion study. The schedules to improve reporting: cell instruction and methodology. The results and additional benefits. Four Tables accompany the study.
SCIMA record nr: 61950
add to basket
« previous | next »
SCIMA