search query: @freeterm REIHENFOLGEPROBLEM / total: 19
reference: 6 / 19
« previous | next »
Author:Gupta, S. M.
Taleb, K. N.
Title:Scheduling disassembly (Montage; Materialplanung)
Journal:International Journal of Production Research
1994 : AUG, VOL. 32:8, p. 1857-1866
Index terms:
Freeterms:REIHENFOLGEPROBLEM
Language:eng
Abstract:The authors present an algorithm for scheduling the disassembly of discrete parts products characterized by a well defined product structure. As opposed to MRP where the demand occurs at the end item level, the demand in the disassembly case is motivated by the component level of the product structure. Even though the objective in the disassembly case is the reverse of hat of MRP, the algorithm itself is not the reverse of the MRP algorithm. An example is presented and its implementation in a spreadsheet is described.
SCIMA record nr: 132326
add to basket
« previous | next »
SCIMA