search query: @freeterm REIHENFOLGEPROBLEM / total: 19
reference: 2 / 19
« previous | next »
Author:Stevens, J. W.
Gemmill, D. D.
Title:Scheduling a two-machine flowshop with travel times to minimize maximum lateness (Auftragsfertigung)
Journal:International Journal of Production Research
1997 : JAN, VOL. 35:1, p. 1-15
Index terms:
Freeterms:FERTIGUNGSPROGRAMMPLANUNG,
REIHENFOLGEPROBLEM
Language:eng
Abstract:As fully automated manufacturing becomes a realization, the problem of scheduling jobs to meet customer due dates comes to the forefront. In this paper, possible sequencing methods are generated for an automated two-machine flowshop with non-negligible transportation times and blocking of the second machine. Two heuristics are developed to sequence a set of jobs with the objective of minimizing maximum lateness. The cases of scheduling the flowshop when it starts in a null state and a busy state are both investigated.
SCIMA record nr: 162049
add to basket
« previous | next »
SCIMA