Author: | Stevens, J. W. Gemmill, D. D. |
Title: | Scheduling a two-machine flowshop with travel times to minimize maximum lateness (Auftragsfertigung) |
Journal: | International Journal of Production Research
1997 : JAN, VOL. 35:1, p. 1-15 |
Index terms: | |
Freeterms: | FERTIGUNGSPROGRAMMPLANUNG, REIHENFOLGEPROBLEM |
Language: | eng |
Abstract: | As fully automated manufacturing becomes a realization, the problem of scheduling jobs to meet customer due dates comes to the forefront. In this paper, possible sequencing methods are generated for an automated two-machine flowshop with non-negligible transportation times and blocking of the second machine. Two heuristics are developed to sequence a set of jobs with the objective of minimizing maximum lateness. The cases of scheduling the flowshop when it starts in a null state and a busy state are both investigated. |