search query: @author Kern, G. M. / total: 2
reference: 1 / 2
« previous | next »
Author:Kern, G. M.
Wei, J. C.
Title:Master production rescheduling policy in capacity-constrained just-in-time make-to-stock environments
Journal:Decision Sciences
1996 : SPRING, VOL. 27:2, p. 365-387
Index terms:PRODUCTION PLANNING
SIMULATION
JUST-IN-TIME PRODUCTION
Language:eng
Abstract:This paper describes a simulation experiment to evaluate the relative effectiveness of rescheduling policies in capacity-constrained, just-in-time (JIT) make-to-stock production environments. Three performance measures were analyzed: average finished goods inventory, total units of sales lost, and a measure of schedule instability. Among the three loading methods we studied (level loading, front loading, and back loading), none was superior across all three performance measures. Level loading was the most robust, while back loading had an interaction effect with forecasting model and capacity level.
SCIMA record nr: 164055
add to basket
« previous | next »
SCIMA