search query: @author Wang, C.-H. / total: 2
reference: 2 / 2
« previous | next »
Author:Wang, C.-H.
Huang, Y.-C.
Title:A new approach to calculating project cost variance
Journal:International Journal of Project Management
2000 : APR, VOL. 18:2, p. 131-138
Index terms:PROJECT MANAGEMENT
COST VARIANCE
TIME
Language:eng
Abstract:A new approach to calculating project cost variance is presented in this paper. The computation of project cost variance usually begins with the cost breakdown structure and uses the simulation method to estimate the variance of a project cost. However, the decomposition of the activities of a project is based on the work breakdown structure, not on the cost breakdown structure. To overcome this limitation, this paper assumes the time and cost of a project to be random and correlative and thereby constructs a computation approach to integrating the time and cost.
SCIMA record nr: 211245
add to basket
« previous | next »
SCIMA