search query: @author Prueitt, G. / total: 2
reference: 1 / 2
« previous | next »
Author: | Prueitt, G. |
Title: | Case study: US army utility helicopter fleet modernization analysis |
Journal: | Engineering Economist
2000 : VOL 45:3, p. 271-289 |
Index terms: | Army Air force Aircraft industry Technology R&D USA |
Language: | eng |
Abstract: | This case study presents a synopsis of how multi-criteria decision analysis techniques were integrated with total cost of ownership considerations to develop a multi-billion dollar equipment modernization strategy, a strategy that is being implemented by the US Army today. |
« previous | next »
SCIMA