Author:De, P.
Wells, C. E.
Title:On the multiple-machine extension to a common due-date assignment and scheduling problem
Journal:Journal of the Operational Research Society
1991 : MAY, VOL. 42:5, p. 419-422
Index terms:PRODUCTION SCHEDULING
PROBLEM SOLVING
OPTIMIZATION
OPERATIONAL RESEARCH
Language:eng
Abstract:The multi-machine extension to a due-date assignment and scheduling problem has been considered by Cheng. However, he implicitly assumes zero start times for all schedules /which does not ensure optimality/, and overlooks the critical V-shape for an optimal schedule /which leads to the overestimation of the effort needed to solve the problem/. In this note some flaws of the work by Cheng are corrected. It is shown that consideration of non-zero start times is essential for generating an optimal schedule. The V-shape property which significantly reduces the search for an optimal solution is also discussed.
SCIMA record nr: 93068
add to basket
« previous | next »
SCIMA