search query: @author Schmitt, T. / total: 3
reference: 1 / 3
« previous | next »
Author:Faaland, B.
Schmitt, T.
Title:Cost-based scheduling of workers and equipment in a fabrication and assembly shop
Journal:Operations Research
1993 : MAR-APR, VOL. 41:2, p. 253-268
Index terms:SCHEDULING
INVENTORY CONTROL
PRODUCTION
Language:eng
Abstract:
SCIMA record nr: 106145
add to basket
« previous | next »
SCIMA