search query: @author Benton, W.C. / total: 3
reference: 1 / 3
« previous | next »
Author:Benton, W.C.
Title:Time- and cost-based priorities for job shop scheduling.
Journal:International Journal of Production Research
1993 : VOL. 31:7, p. 1509-1519
Index terms:
Freeterms:FERTIGUNGSPLANUNG, OPTIMIERUNGSRECHNUNG
Language:eng
Abstract:Competitively, cost- and time-based scheduling should provide a firm with a powerful market advantage. The cost- and time-based priority scheduling concept is driven by profit maximization and quick response in a competitive market. A simplistic priority rule based on profit margin and due dates is introduced and tested. The results reported in this research are an attempt to reconcile the issue of time-based versus cost-based priority rule performance.
SCIMA record nr: 121115
add to basket
« previous | next »
SCIMA