search query: @author Sepil, C. / total: 3
reference: 1 / 3
« previous | next »
Author:Sepil, C.
Ortas, N.
Title:Performance of the heuristic procedures for constrained projects with progress payments
Journal:Journal of the Operational Research Society
1997 : OCT, VOL. 48:11, p. 1123-1130
Index terms:HEURISTIC METHODS
PAYMENT SYSTEMS
OPERATIONAL RESEARCH
Language:eng
Abstract:All large scale resource constrained projects involve cash flows occurring during their life cycle. Several recent studies consider the problem of scheduling projects to to maximise the net present value (NPV) of these cash flows. Their basic common assumption is that cash flows are mainly associated with specific events and they occur at event realisation times. An alternative assumption, which can be more realistic, is that cash inflows occur periodically.
SCIMA record nr: 169945
add to basket
« previous | next »
SCIMA