search query: @journal_id 26 / total: 303
reference: 88 / 303
Author: | Shull, D. |
Title: | Overall rates of return: investment basis, reinvestment rates and time horizons |
Journal: | Engineering Economist
1994 : WINTER, VOL. 39:2, p. 139-164 |
Index terms: | INVESTMENT ECONOMICS TIME |
Language: | eng |
Abstract: | This paper compares and contrasts several previously proposed rate of return capital budgeting methodologies. It focuses on recently proposed overall rate of return methods that provide NPV-consistent project evaluations. The examination is undertaken by introducing a conceptual framework to characterize rate of return methods along the following three parameters: (1) the investment base, (2) the reinvestment rate, and (3) the time horizon over which projects are evaluated. |
SCIMA