search query: @journal_id 26 / total: 303
reference: 23 / 303
« previous | next »
Author:Prueitt, G.
Title:Case study: US army utility helicopter fleet modernization analysis
Journal:Engineering Economist
2000 : VOL 45:3, p. 271-289
Index terms:Army
Air force
Aircraft industry
Technology
R&D
USA
Language:eng
Abstract:This case study presents a synopsis of how multi-criteria decision analysis techniques were integrated with total cost of ownership considerations to develop a multi-billion dollar equipment modernization strategy, a strategy that is being implemented by the US Army today.
SCIMA record nr: 217165
add to basket
« previous | next »
SCIMA