search query: @indexterm TIME / total: 304
reference: 112 / 304
Author: | Voros, J. |
Title: | Lot sizing with quality improvement and setup time reduction |
Journal: | European Journal of Operational Research
1999 : MAR 16, VOL. 113:3, p. 568-574 |
Index terms: | OPERATIONAL RESEARCH QUALITY TIME |
Language: | eng |
Abstract: | In this paper the author develops a model that considers process quality improvement and setup cost reduction. The distinctive characteristics of the model are embodied in the assumptions that production rate is finite and cost of attaining close to zero setup time is not infinite. Additionally, the process layout makes possible spotting problems at the place of appearance and these problems can be fixed. The outcome of the analysis under these assumptions supports the popular operations paradigm that reducing response time and increasing process reliability are parallel processes. |
SCIMA