search query: @freeterm FERTIGUNGSPROGRAMMPLANUNG, / total: 36
reference: 31 / 36
« previous | next »
Author:Cho, H.
Wysk, R. A.
Title:A robust adaptive scheduler for an intelligent workstation controller. (Planungsmodell)
Journal:International Journal of Production Research
1993 : APR, VOL. 31:4, p. 771-789
Index terms:
Freeterms:FERTIGUNGSPROGRAMMPLANUNG,
REIHENFOLGEPROBLEM
Language:eng
Abstract:A shop floor control system consisting of three hierarchical control levels (shop, workstation, and equipment) is described. The objectives of this paper are: - to develop a neural network model that generates several part dispatching strategies based on workstation status, - to develop a simulator that evaluates the generated strategies and selects the best strategy, and - to compare the efficiency of the scheduling function with other single pass strategies.
SCIMA record nr: 121023
add to basket
« previous | next »
SCIMA