search query: @freeterm FERTIGUNGSPROGRAMMPLANUNG, / total: 36
reference: 31 / 36
Author: | Cho, H. Wysk, R. A. |
Title: | A robust adaptive scheduler for an intelligent workstation controller. (Planungsmodell) |
Journal: | International Journal of Production Research
1993 : APR, VOL. 31:4, p. 771-789 |
Index terms: | |
Freeterms: | FERTIGUNGSPROGRAMMPLANUNG, REIHENFOLGEPROBLEM |
Language: | eng |
Abstract: | A shop floor control system consisting of three hierarchical control levels (shop, workstation, and equipment) is described. The objectives of this paper are: - to develop a neural network model that generates several part dispatching strategies based on workstation status, - to develop a simulator that evaluates the generated strategies and selects the best strategy, and - to compare the efficiency of the scheduling function with other single pass strategies. |
SCIMA