search query: @freeterm FERTIGUNGSPROGRAMMPLANUNG, / total: 36
reference: 12 / 36
« previous | next »
Author:Guinet, A. G. P.
Solomon, M. M.
Title:Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time (mathematisches Modell, Maschinenbelegungsplanung, Auftragsfertigung)
Journal:International Journal of Production Research
1996 : JUN, VOL. 34:6, p. 1643-1654
Index terms:
Freeterms:FERTIGUNGSPROGRAMMPLANUNG,
OPTIMIERUNGSRECHNUNG
Language:eng
Abstract:The problem of scheduling independent jobs on several serial workshops consisting of identical parallel machines is studied. Each job is processed by one machine in each workshop. This workshop environment is called a hybrid flowshop. Each job has its own due date and the objective is to minimize maximum tardiness or maximum completion time.
SCIMA record nr: 153910
add to basket
« previous | next »
SCIMA