search query: @author Sum, C. / total: 4
reference: 3 / 4
« previous | next »
Author:Sum, C.
Hill, A.
Title:A new framework for manufacturing planning and control systems
Journal:Decision Sciences
1993 : JUL-AUG, VOL. 24:4, p. 739-760
Index terms:MATERIALS
PLANNING
CONTROL
Language:eng
Abstract:This paper presents a new framework for manufacturing planning and control systems which may be called iterative manufacturing planning in continuous time (IMPICT) that appears to have several advantages over the well-known material requirements planning (MRP) framework. IMPICT explicitly considers capacity constraints and total system cost to determine order sizes, order release/due dates, and operation schedules in a deterministic, multi-level, finite horizon, dynamic demand environment. Continuous time scheduling variables allow setups to be carried over from one period to the next.
SCIMA record nr: 109133
add to basket
« previous | next »
SCIMA