search query: @author Kang, J. / total: 4
reference: 2 / 4
« previous | next »
Author:Leachman, R. C.
Lin, V.
Kang, J.
Title:SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics
Journal:Interfaces
2002 : JAN-FEB, VOL. 32:1, p. 61-77
Index terms:PERFORMANCE APPRAISAL
PRODUCTIVITY
COMPUTER INDUSTRY
ELECTRONICS INDUSTRY
Language:eng
Abstract:SLIM is a set of methodologies and scheduling applications for managing cycle time in semiconductor manufacturing. SLIM includes methodology for calculating target cycle times and target WIP levels for individual manufacturing steps, heuristic algorithms for factory floor scheduling, and optimization-based capacity analysis. Between 1996 and 1999, Samsung Electronics Corp., Ltd., implemented SLIM in all its semiconductor manufacturing facilities. It reduced manufacturing cycle times to fabricate dynamic random access memory devices from more than 80 days to less than 30.
SCIMA record nr: 238032
add to basket
« previous | next »
SCIMA