search query: @author Ahmadi, R. H. / total: 4
reference: 3 / 4
« previous | next »
Author:Ahmadi, R. H.
Bagchi, U.
Title:Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop.
Journal:European Journal of Operational Research
1990 : FEB 15, VOL. 44:3, p. 331-3364
Index terms:PRODUCTION SCHEDULING
FLOW PRODUCTION
Language:eng
Abstract:
SCIMA record nr: 78341
add to basket
« previous | next »
SCIMA