search query: @freeterm Fertigungsprogrammplanung / total: 47
reference: 19 / 47
« previous | next »
Author:Guide, V. D. R. Jr
Title:Scheduling using drum/buffer/rope in a remanufacturing environment (Maschinenbelegungsplanung, Montage, mathematisches Modell)
Journal:International Journal of Production Research
1996 : APR, VOL. 34:4, p. 1081-1091
Index terms:
Freeterms:FERTIGUNGSPROGRAMMPLANUNG
Language:eng
Abstract:Scheduling in a remanufacturing environment is more complex and the schedular must deal with more uncertainty than in a traditional manufacturing environment. The schedule must be able to cope with conditional routeing, a routeing that may or may not be taken due to the condition of the unit. Drum/buffer/rope (DBR) offers an extremely robust method of scheduling. A realistic example is discussed in detail and each step to build a schedule using DBR is explained. The results from a simulation model at a repair/rework depot are benchmarked against the present production planning and control system.
SCIMA record nr: 151360
add to basket
« previous | next »
SCIMA