Title:Dealing with delay claims: a survey.
Journal:International Journal of Project Management
1993 : AUG, VOL. 11:3, p. 143-153
Index terms:CRITICAL PATH METHOD
SURVEYS
PROJECT MANAGEMENT
Language:eng
Abstract:A survey was conducted in which interviews were carried out with contractors and supervising engineers to identify the extent to which claims for delay occur on major contracts, and also to discover how such claims are prepared and assessed. The main part of the survey addressed the means by which contractors attempt to justify their claims, and the methods of assessment of these claims used by supervising engineers. The paper presents conclusions concerning attitudes towards such claims and also the mechanisms which are used to prepare and evaluate them.