search query: @freeterm FERTIGUNGSPLANUNG, OPTIMIERUNGSRECHNUNG / total: 5
reference: 3 / 5
Author: | Benton, W.C. |
Title: | Time- and cost-based priorities for job shop scheduling. |
Journal: | International Journal of Production Research
1993 : VOL. 31:7, p. 1509-1519 |
Index terms: | |
Freeterms: | FERTIGUNGSPLANUNG, OPTIMIERUNGSRECHNUNG |
Language: | eng |
Abstract: | Competitively, cost- and time-based scheduling should provide a firm with a powerful market advantage. The cost- and time-based priority scheduling concept is driven by profit maximization and quick response in a competitive market. A simplistic priority rule based on profit margin and due dates is introduced and tested. The results reported in this research are an attempt to reconcile the issue of time-based versus cost-based priority rule performance. |
SCIMA