search query: @freeterm ENERGIEVERSORGUNGSBETRIEBE / total: 5
reference: 5 / 5
« previous | next »
Author:Sumanth, D. J.
Title:A power plant maintenance worker productivity process (Fertigungskontrolle)
Journal:Industrial Engineering
1992 : OCT, VOL. 24:10, p. 54-57
Index terms:
Freeterms:FERTIGUNGSINSTANDHALTUNG, ARBEITSSTUDIEN
ENERGIEVERSORGUNGSBETRIEBE
Language:eng
Abstract:In order to measure maintenance worker productivity and methods to improve it, a productivity management process can be defined through the 4 phases of the productivity measurement, evaluation, planning and improvement. Work sampling, as part of a comprehensive productivity management process, provides a solution to this problem. The specific application presented in this article proves this.
SCIMA record nr: 135356
add to basket
« previous | next »
SCIMA