search query: @freeterm ENERGIEVERSORGUNGSBETRIEBE / total: 5
reference: 5 / 5
« previous | next »
Author: | Sumanth, D. J. |
Title: | A power plant maintenance worker productivity process (Fertigungskontrolle) |
Journal: | Industrial Engineering
1992 : OCT, VOL. 24:10, p. 54-57 |
Index terms: | |
Freeterms: | FERTIGUNGSINSTANDHALTUNG, ARBEITSSTUDIEN ENERGIEVERSORGUNGSBETRIEBE |
Language: | eng |
Abstract: | In order to measure maintenance worker productivity and methods to improve it, a productivity management process can be defined through the 4 phases of the productivity measurement, evaluation, planning and improvement. Work sampling, as part of a comprehensive productivity management process, provides a solution to this problem. The specific application presented in this article proves this. |
« previous | next »
SCIMA