search query: @author Millen, R. A. / total: 5
reference: 3 / 5
Author: | Blackburn, J. D. Kropp, D. H. Millen, R. A. |
Title: | A comparison of strategies to dampen nervousness in MRP systems. |
Journal: | Management Science
1986 : APR, VOL. 32:4, p. 413-429 |
Index terms: | MATERIALS MANAGEMENT INVENTORY CONTROL SIMULATION |
Language: | eng |
Abstract: | Five different strategies for treating nervousness, or order instability, caused by the interaction of lot-sizing decisions and the planning horizon are proposed and evaluated: (1) Freezing the schedule within the planning horizon, (2) Lot-for-lot after stage 1, (3) Safety stocks, (4) Forecast beyond the planning horizon, and (5) Change cost procedure. A series of simulation experiments was conducted to test the effectiveness of the five strategies on schedule stability and system costs. |
SCIMA