search query: @author Werra, D. de / total: 6
reference: 3 / 6
« previous | next »
Author:Werra, D. de
Title:On the two-phase method for preemptive scheduling.
Journal:European Journal of Operational Research
1988 : NOV, VOL. 37:2, p. 227-235
Index terms:MANUFACTURING INDUSTRY
SCHEDULING
NETWORKS
Language:eng
Abstract:
SCIMA record nr: 63962
add to basket
« previous | next »
SCIMA