search query: @freeterm FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM / total: 7
reference: 4 / 7
« previous | next »
Author:Arosio, M.
Sianesi, A.
Title:A heuristic algorithm for master production schedule generation with finite capacity and sequence dependent setups. (Planungsmodell, Fertigungskontrolle)
Journal:International Journal of Production Research
1993 : VOL. 31:3, p. 531-553
Index terms:
Freeterms:FERTIGUNGSPLANUNG, REIHENFOLGEPROBLEM
Language:eng
Abstract:Correct formulation of the MPS is important for the optimization of a production planning and control system. Most of the models solve the problem in two separate sequential stages: lot sizing and then sequencing. This often produces an MPS which is not optimized. This paper presents a heuristic algorithm which solves the problem of lot sizing and sequencing in a single logic stage, together with the results of a series of tests carried out to compare the performance of the proposed heuristic and those of another algorithm taken from literature.
SCIMA record nr: 120893
add to basket
« previous | next »
SCIMA