search query: @indexterm BRANCH AND BOUND METHODS / total: 70
reference: 9 / 70
« previous | next »
Author:Tadei, R.
Title:Minimising makespan in the two-machine flow-shop with release times
Journal:Journal of the Operational Research Society
1998 : JAN, VOL. 49:1, p. 77-85
Index terms:BRANCH AND BOUND METHODS
PRODUCTION SCHEDULING
Language:eng
Abstract:
SCIMA record nr: 165414
add to basket
« previous | next »
SCIMA