search query: @author Lin, B. / total: 9
reference: 9 / 9
« previous | next »
Author:Lee, C.
Cheng, T.
Lin, B.
Title:Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
Journal:Management Science
1993 : MAY, VOL. 39:5, p. 616-625
Index terms:SCHEDULING
PRODUCTION
MANAGEMENT SCIENCE
Language:eng
Abstract:This paper considers minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. After problem formulation, the authors present a proof to show that the general version of this problem is strongly NP-complete. The authors discuss a few polynomially solvable cases of the problem and present the solution algorithms. Next, a branch and bound solution scheme is suggested. Finally, three heuristics to find approximate solutions to the general problem are proposed and their error bounds are analysed.
SCIMA record nr: 108548
add to basket
« previous | next »
SCIMA