Tekijä:Teunter, R. H.
Haneveld W. K. K.
Otsikko:Inventory control of service parts in the final phase: A central depot and repair kits
Lehti:European Journal of Operational Research
2002 : APR, VOL. 138:1, p. 76-86
Asiasana:INVENTORIES
SERVICE
MANUFACTURING INDUSTRY
Kieli:eng
Tiivistelmä:The authors consider an appliance manufacturer's problem of controlling the inventory of a service part in its final phase. That phase begins when the production of the appliance using that part is discontinued (time 0), and ends when the last service contract on that appliance expires. Thus, the planning horizon is deterministic and known. Parts are stocked in repair kits that repairmen carry to jobsites. If enough parts are available, then each kit contains one and the surplus is stocked at a central warehouse. Otherwise, some kits contain a service part but others do not. The objective is to minimize the total expected undiscounted costs of replenishment, inventory holding, penalty (for 'broken' jobs), and disposal (of unused parts at the end of the planning horizon).
SCIMA tietueen numero: 234239
lisää koriin
SCIMA