Tekijä:Sawik, T. J.
Otsikko:Multilevel scheduling of multistage production with limited in-process inventory
Lehti:Journal of the Operational Research Society
1987 : JUL, VOL. 38:7, p. 651-664
Asiasana:PRODUCTION SCHEDULING
Kieli:eng
Tiivistelmä:A multistage, multiproduct production scheduling with limited in-process buffers between the successive stages is considered. An assignment of products to machines over a scheduling horizon, which minimizes the completion time of the production order, with in-process inventory holding costs as low as possible is aimed to determine. Multilevel integer programmes are used, each of which is concerned with scheduling a different stage of production. A hierarchical scheduling algorithm and an example for a three-stage production is presented.
SCIMA tietueen numero: 68491
lisää koriin
SCIMA