| Tekijä: | Berkley, B. J. |
| Otsikko: | Tandem queues and kanban-controlled lines |
| Lehti: | International Journal of Production Research
1991 : OCT, VOL. 29:10, p. 2057-2081 |
| Asiasana: | |
| Vapaa asiasana: | FERTIGUNGSSTEUERUNG, FERTIGUNGSÜBERWACHUNG, MATERIALFLUSS |
| Kieli: | eng |
| Tiivistelmä: | Many of the kanban systems described in the production literature, and used in practice, are equivalent to a tandem queue. This paper shows when tandem queues can be used to obtain the performance measures of two-card systems. Results from a simulation study show that the tandem queue serves as an upper bound for more general two-card systems. The practical significance of this is that a tandem queue approximation can be used to find the minimum number of kanbans required to achieve a desired production rate. |