haku: @freeterm FERTIGUNGSÜBERWACHUNG, MATERIALFLUSS / yhteensä: 1
viite: 1 / 1
« edellinen | seuraava »
Tekijä: | Berkley, B. J. |
Otsikko: | Tandem queues and kanban-controlled lines |
Lehti: | International Journal of Production Research
1991 : OCT, VOL. 29:10, p. 2057-2081 |
Asiasana: | |
Vapaa asiasana: | FERTIGUNGSSTEUERUNG, FERTIGUNGSÜBERWACHUNG, MATERIALFLUSS |
Kieli: | eng |
Tiivistelmä: | Many of the kanban systems described in the production literature, and used in practice, are equivalent to a tandem queue. This paper shows when tandem queues can be used to obtain the performance measures of two-card systems. Results from a simulation study show that the tandem queue serves as an upper bound for more general two-card systems. The practical significance of this is that a tandem queue approximation can be used to find the minimum number of kanbans required to achieve a desired production rate. |
« edellinen | seuraava »
SCIMA