haku: @author Brandimarte, P. / yhteensä: 1
viite: 1 / 1
« edellinen | seuraava »
Tekijä: | Brandimarte, P. Calderini, M. |
Otsikko: | A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling (Kostenminimierung, Maschinenbelegungsplanung) |
Lehti: | International Journal of Production Research
1995 : JAN, VOL. 33:1, p. 161-181 |
Asiasana: | |
Vapaa asiasana: | FERTIGUNGSSTEUERUNG, FERTIGUNGSPLANUNG, FERTIGUNGSPROGRAMMPLANUNG, OPTIMIERUNGSRECHNUNG |
Kieli: | eng |
Tiivistelmä: | The job shop scheduling literature deals with problems characterized by a fixed linear process plan for each job: it is assumed that the process planning problem has been solved before scheduling, and no flexibility in the process plan is considered. This article proposes a solution approach for a joint process plan selection and job shop scheduling problem, taking both operations cost and makespan into account within a multi-objective framework. |
« edellinen | seuraava »
SCIMA