haku: @author Ortas, N. / yhteensä: 1
viite: 1 / 1
« edellinen | seuraava »
Tekijä: | Sepil, C. Ortas, N. |
Otsikko: | Performance of the heuristic procedures for constrained projects with progress payments |
Lehti: | Journal of the Operational Research Society
1997 : OCT, VOL. 48:11, p. 1123-1130 |
Asiasana: | HEURISTIC METHODS PAYMENT SYSTEMS OPERATIONAL RESEARCH |
Kieli: | eng |
Tiivistelmä: | All large scale resource constrained projects involve cash flows occurring during their life cycle. Several recent studies consider the problem of scheduling projects to to maximise the net present value (NPV) of these cash flows. Their basic common assumption is that cash flows are mainly associated with specific events and they occur at event realisation times. An alternative assumption, which can be more realistic, is that cash inflows occur periodically. |
« edellinen | seuraava »
SCIMA