Tekijä:Spahr, R. W.
Schwebach, R. G.
Putnam, F. A.
Otsikko:Per unit cost allocation of invested capital with anticipated non-level production: the case of extractive industries
Lehti:Engineering Economist
1999 : VOL. 44:4, p. 332-347
Asiasana:Cost accounting
Capital investment
Production
Econometric models
Engineering industry
Kieli:eng
Tiivistelmä:The concept of equivalent annual annuity (EAA) has long been used as a method of costing recovery of invested capital and the required return on invested capital over the productive life of capital project. The authors develop a methodology for allocating capital costs evenly over each unit of production for projects with anticipated nonlevel production. They apply this methodology to data taken from a currently operating gas field in Wyoming.
SCIMA tietueen numero: 202524