Otsikko:Lot sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty (Materialplanung)
Lehti:International Journal of Production Research
1995 : AUG, VOL. 33:8, p. 2241-2276
Asiasana:
Vapaa asiasana:FERTIGUNGSPROGRAMMPLANUNG, OPTIMALE
LOSGRÖSSE
Kieli:eng
Tiivistelmä:Freezing the master production schedule (MPS) is one of the frequently used methods for reducing schedule instability in multilevel material requirements planning (MRP) systems. The selection of the lot sizing rule is an important decision in MRP systems and has been shown to significantly influence MRP performance. This study examines the interaction between the selection of lot sizing rules and the selection of MPS freezing parameters under rolling time horizons under different demand uncertainty conditions.