haku: @indexterm Re-engineering / yhteensä: 147
viite: 10 / 147
Tekijä:Ezzamel, M.
Willmott, H.
Worthington, F.
Otsikko:Power, control and resistance in "the factory that time forgot"
Lehti:Journal of Management Studies
2001 : DEC, VOL. 38:8, p. 1053-1079
Asiasana:FACTORIES
MANAGEMENT
PRODUCTION
RE-ENGINEERING
Kieli:eng
Tiivistelmä:This paper contributes to a developing body of literature which questions the claim that the "factory of the future" is a total institution in which self-subordination through "new wave management" is virtually inescapable. It examines the experience of frustrated management efforts to re-engineer working practices, mainly at the point of production, in response to repeated corporate-driven initiatives designed to implement a range of "lean manufacturing" initiatives at "Northern Plant", a pseudonym.
SCIMA tietueen numero: 230239
lisää koriin
SCIMA